For charge point operators
We see CPOs like you lose margin to rising grid fees and DSO approvals that drag on for months, while chargers you already own sit under-utilized. gridX allows you to install {{kpi:evci-charge-points}} the amount of charge points with the same grid connection and save {{kpi:evci-annual-savings}} a year on energy costs.

Rising grid fees, climbing electricity costs and the infrastructure investment behind every new site squeeze what's left of your margin per session.
Every OEM speaks a different protocol, and getting a DSO's sign-off can take the better part of a year before a new charging site goes live with a new grid connection.
Locking into a single hardware vendor caps which sites you can take on and how fast you can scale into new ones.
With occupancy rates dropping, the new reality is getting more out of every site. We empower you to save energy costs, increase charge points per site 8x without a grid connection upgrade and go beyond grid limits with co-located batteries.

Increase charging capacity 3x beyond the grid connection limit by integrating local storage, ensure all chargers automatically comply with §14a EnWG and constantly protect the fuse, all with 99.99% platform uptime.

Lower energy costs by 25% with dynamic tariff optimization, shave peaks to minimize grid fees and unlock greater savings with dynamic grid fee optimization. Cut costs even further by aggregating the flexibility of on-site batteries and optimizing procurement, without affecting charger speed.
A clear path from first conversation to a live, profitable rollout. Each step has an owner, so you always know who does what.
2 weeks
Get to know gridX and our technical and strategic experts and find a business case that matches your needs.
2 weeks to 3 months
Set measurable goals and bring your first pilot live on a real site within weeks.
2 weeks
We sign a clear contract with clear expectations for both parties, developed during the pilot phase.
1 month
Get structured training for operations, support and installers, and get the full setup live fast.
Done
Our account team and technical experts accompany you, from the first live charge point to mass scale with thousands of assets.
We integrate {{kpi:evci-supported-oems}} OEMs including the most common AC and DC chargers and storage systems. If a model isn't yet supported, it might already be on our roadmap.
Pricing has three parts: a platform fee, a fee per connected asset (each charge point is a billable asset), and the value bundles you use (Control, Optimize and/or Flex). If you use the gridBox gateway, that's priced separately per site. Our pricing is based on your fleet and site mix and the more you scale, the cheaper it gets.
Every load management and tariff decision the platform makes is visible in the dashboard, with the DSO signal, tariff input or fuse limit that triggered it. If something looks wrong, our account team can trace it back to the exact input.
Regulatory compliance (grid codes like G100/VDE, and §14a EnWG where it applies) is automatic and built into onboarding, not a manual add-on step.
Chat to an expert today.
Fastned, Allego and other leading charge point operators run their networks on gridX.
Talk to one of our sales reps and find out how we can help you get more charging capacity out of every site.