Cut your charging sites’ energy costs by 25%

Optimize according to dynamic tariffs, integrate local PV and batteries and prioritize chargers based on user priority or charging schedules.

A teal banner shows a rising performance chart next to an EV fleet charging at a building with rooftop solar panels.

Why gridX?

A teal icon of a hexagonal shape with circuit-like lines on the left and a stylized letter 'K' with connected nodes on the right.

Cut 1/4 of your costs without manual effort

Automatically shift charging sessions to cheaper price periods. Get lower charging costs while still ensuring each vehicle reaches its desired state of charge.

A teal gavel icon.

Save up to {{kpi:evci-grid-fee-savings}} per site per year with DSO signaling

Comply with Paragraph 14a in Germany and lower your annual grid fees.

A teal icon of four arrows pointing outward from a central dot, in a diagonal cross pattern.

Build the charging site of the future

Expand your usable charging capacity with PV or BESS and build future-proof charging sites and depots.

Why is EVCI Optimize so relevant now?

Grid congestion in the Netherlands and new regulation in Germany are increasing charging sites’ costs and complexity. Operators who respond to grid and market signals get paid for it, the rest absorb the cost.

The EVCI value stack

Where is Optimize in the value stack?

{{kpi:evci-charge-points}} the charge points, {{kpi:evci-grid-savings}} saved on grid extensions and {{kpi:evci-peak-shaving}} saved per year
Control
Cut {{kpi:evci-cost-reduction}} of energy costs and save {{kpi:evci-grid-fee-savings}} per site per year with grid compliance
Optimize
Generate up to {{kpi:evci-flex-value}} per year in value
Flex
A gridBox by gridX
Two clouds, teal and yellow, connected by a line, representing gridX's cloud connectivity

Connect Platform

A white card with the text API in gridX's teal color
A laptop screen showing a gridX dashboard with data panels
01 What’s included in EVCI Optimize?
Dynamic tariff optimization

Cut 1/4 of your costs without manual effort

Automatically shift charging sessions to cheaper price periods using price signals and demand forecasts. Lower charging costs while still ensuring each vehicle reaches its desired state of charge.

An office building with rooftop solar panels and an EV fleet charging connects to a rising teal bar chart and a laptop showing a euro sign and upward trend line.
02 What’s included in EVCI Optimize?
Demand-based prioritization

Ensure every vehicle is ready when needed

Prioritize charging load allocation according to vehicle priority levels. This is especially useful for schedule-based charging at depots. The logic connects to other system backends through an open API.

Teal and white delivery vans and cars connected by lines to charging points, with one vehicle highlighted lighter to show priority.
03 What’s included in EVCI Optimize?
DSO signaling

Save up to {{kpi:evci-grid-fee-savings}} per site per year with §14a compliance

Comply with §14a in Germany and lower your annual grid fees. Choose the module that fits your site’s needs:

Module 1: Flat grid fee reduction of {{kpi:evci-14a-module1-value}}
Module 2: {{kpi:evci-14a-module2-share}} fee reduction billed on a kWh basis (up to {{kpi:evci-grid-fee-savings}})
Module 3: Save up to {{kpi:evci-14a-module3-value}} with dynamic grid fee optimization

A clipboard checklist with checked boxes and a stamp bearing a blue dashed box labeled '§14a' with a checkmark.
04 What’s included in EVCI Optimize?
Virtual grid expansion

Expand usable charging capacity with PV or BESS

Integrate battery and photovoltaic systems and discharge locally generated or stored power during high-demand periods. This expands charging capacity without raising your contracted grid connection point.

A person holding a phone stands next to a car at a charging station, a rooftop solar array, and a battery, with a speech bubble showing solar and chart icons.
“With the growing demand for EV charging, especially at commercial sites, virtual grid expansion has become a game changer. By integrating battery storage, we’re not only future-proofing our infrastructure, but also intelligently using existing grid capacity.”
Portrait of Rahul Bhanu from E.ON
Rahul Bhanu
Product Manager
Who EVCI Optimize is for

Which description fits your company best?

A person holding a tablet stands beside an isometric building with rooftop solar panels and a covered multi-bay EV charging structure.

Charge point operator

We operate a public charging network. We want to get more out of a limited grid connection, cut grid fees and peak charges and raise site profitability. Uptime and utilization come first.

A person holding a tablet stands next to an isometric scene of electric vehicles at charging stations with a robotic vehicle and signal waves.

E-mobility solution provider

We build and operate charging infrastructure for other companies, mostly depots and workplace sites. We want to win tenders, manage many customer accounts from one place and keep every site profitable. Reliable operations and SLA-backed service come first.

Trusted by Europe’s leading charging networks

E.ON Drive, ChargeOne, Fastned, Allego and many other big players in the market intelligently connect their charging infrastructure with gridX.

Ready to optimize?

Talk to one of our sales reps and find out how Optimize benefits you.