Maximize every kilowatt of charging power, while preventing costly overloads and avoiding expensive grid extensions.

On high-occupancy sites you can fit up to {{kpi:evci-charge-points}} as many charge points without investing around {{kpi:evci-grid-savings}} in grid extensions (gridX estimate, 2026).
With peak shaving you can save up to {{kpi:evci-peak-shaving}} per year per site (gridX estimate, 2026).
Receive and integrate mandatory grid operator curtailment signals, so your sites stay aligned with local grid requirements.
Avoid disruptions by ensuring no fuse – also at sites with multi-fuse architecture – is ever blown. This allows you to save costs on infrastructure expansion and lower operational costs by avoiding site visits and infrastructure damage.

Intelligently distribute available charging power amongst active chargers in real time. Increase charger utilization and boost customer satisfaction by always providing the highest possible power.

Curtail charging peaks, not volume, to significantly reduce grid fees. Ensure customer-defined peak thresholds are never breached.

Receive and integrate mandatory grid operator curtailment signals to ensure your sites always adhere to local grid requirements.


We operate a public charging network. We want to get more out of a limited grid connection, cut grid fees and peak charges, and raise site profitability. Uptime and utilization come first.

We build and operate charging infrastructure for other companies, mostly depots and workplace sites. We want to win tenders, manage many customer accounts from one place and keep every site profitable. Reliable operations and SLA-backed service come first.
E.ON Drive, ChargeOne, Fastned, Allego and many other big players in the market intelligently connect their charging infrastructure with gridX.
Talk to our sales team and find out what EVCI Control can do for your sites.